Because time waits for no one, keeping enclosure time at a minimum was vital in the construction of the Solano County SB 1022 Classroom and Vocational Training Center in Fairfield, Calif. Building codes require the building be enclosed before much of the inside work begins, so Metl-Span’s HPCI Barrier Wall Panels were prescribed to keep construction moving along.
A major renovation and addition to a building that’s a part of the Tech Parks Arizona has created additional working space for potential research and development tenants. Aesthetics played a large role in the choice of insulated metal panels from Metl-Span for the addition.
Design-build projects for the public sector always come with specific requirements with little room for flexibility. The City of Palm Beach Gardens, Fla., wanted its new Operations Center to meet the requirements of LEED Silver certification, look great and be designed to withstand 205 mph ultimate wind speeds, all while staying within a strict budget. The choice of insulated metal panels (IMPs) from Metl-Span helped meet those goals.
Construction of the new Rosenwald Recreation Center was a key component in the rebuilding of Council District B in New Orleans following Hurricane Katrina in 2005