The proper development of specifications is essential due to the complexity of the waterproofing process that occurs with the integration of other building components and trades. It is the responsibility of the architect and/or designer to ensure that all divisions of waterproofing application are addressed.
The excavation outside the foundation shall be backfilled with soil that is free of organic material, construction debris, cobbles and boulders or with a controlled low-strength material (CLSM).