Two primary needs were to upgrade the fireproofing for the storage of Ecolab’s flammable items, and warehouse flooring to accommodate their double rack (shelving) systems. These critical requirements needed to be installed in a tight-time frame, all while meeting LEED specifications.
1807.3 Waterproofing required. Where the ground-water investigation required by Section 1802.2.3 indicates that a hydrostatic pressure condition exists.