Design-build projects for the public sector always come with specific requirements with little room for flexibility. The City of Palm Beach Gardens, Fla., wanted its new Operations Center to meet the requirements of LEED Silver certification, look great and be designed to withstand 205 mph ultimate wind speeds, all while staying within a strict budget. The choice of insulated metal panels (IMPs) from Metl-Span helped meet those goals.
Built in 1955, Laurel Plaza in North Hollywood, California, has had quite a history – and is now entering the next phase of its story. The building transitioned from its original May Co. store to a bustling shopping center with Macy’s as its anchor before suffering significant earthquake damage a few years ago.
Our More Than Just an R-Value: Acoustics and stone wool Insulation CEU Webinar on May 21st at 11:30 am EST focuses on how stone wool products can help to protect property, extend building life and reduce overall building energy consumption, but that is not all...
A closed-cell, energy-efficient spray foam was selected for the lab retrofit. The insulation is the first in its class to leverage HFO technology in its blowing agent
In Denver, the architectural team was laying out the design for a flagship store for the company, and wanted an ultra-smooth finish, keeping reveals and breaks to a minimum
rFOIL Reflective Insulation 2200 Series underlayment in an effective energy efficient barrier that can greatly reduce transfer of radiant heat through roofing.