After removing old peel-and-stick waterproofing materials and other decaying roofing materials, the started the installation of three different roofing systems
Historically, architects and other designers have often called for a flood test to be carried out on horizontal waterproofing systems when the membrane is under a green roof, wear-course or topping slab where direct inspection of the roof membrane is difficult or impossible
The existing roof on this luxury condominium complex, a 20+-year-old tapered modified bitumen system, was failing and owners were spending a lot of money on repairs
For the Kerack Project, the team concluded that the facility needed far more than the project budget could support and decided it was critical to provide assistance for the complicated reroofing project
This course will explain the importance of each of these questions and offer actionable insights into roof system design that can maximize solar output and provide long-term performance of the roof system that can outlast the life expectancy of the PV arrays.
Metal roofing plays a big role in the new venue’s design – especially in a clamshell layout over the stage that provided an opportunity for installers to showcase their skills
ICP Building Solutions Group has launched its new Polyset TPO/EPDM Spray Contact Adhesive, designed as a portable, self-containing, single component solution to help professionals complete jobs quickly and efficiently.