Reflecting its creative and influential approach to urban high-rise architecture, award-winning firm The Architectural Team (TAT) has announced the completion of its design for the Raffles Boston Hotel & Residences – a striking new luxury hospitality and residential destination, lauded as “the city’s most exciting new hotel opening."
To meet the University’s requirements for a highly sustainable, energy-efficient design with a minimum of 30 percent glazing, the team utilized Honeybee software linked to Grasshopper/Rhino to run detailed daylighting, comfort, and energy calculations.
In 2019, University of Cincinnati Health announced its $221 million Clifton Campus Revitalization project. The goal of the project is to create innovative environments that reflect the expertise and passion happening within its medical center every day.
The renovation work for the 1960s-1970s era original brick façade buildings included extensive interior and exterior work, the complete resurfacing of the buildings’ façades and the replacement of all windows.
On campus, a new bridge designed by architect Smith Group, Denver, CO was built between the Maverick Center and the Maverick Pavilion that now connects an expanded indoor track above five new basketball/volleyball courts, a new classroom, and an athletic training lab.
Now a recently completed 243-unit apartment building has taken its place in a development that also has added public access to the river for boaters, cyclists and pedestrians. The metal-clad façade creates a clean-lined appearance that allows the surrounding environment to take center stage.
One of the oldest buildings at UC Davis and located in the heart of campus, the project transformed a vacant, seismically unsafe building into a dynamic multi-functional graduate and professional student center complex with meeting rooms, a lecture hall, and sophisticated active-learning classrooms that serves the entire campus.
When installing solar panels (typically warranted for 25 years of power generation), a building owner benefits from a roofing substrate that has a greater life expectancy than the solar panels. The solar panels can be installed to the metal panel seams using special clamps, without any roof penetrations.
The Consolidated Headquarters Complex for the California Military Department recently opened, bringing together the California Army National Guard, California Air National Guard, and California State Guard in one location.