The complete digital planning and control of the construction project could be realized without delays thanks to the corresponding BIM tools in close coordination with the police.
The Center of Developing Entrepreneurs is a new sustainable, mixed-use project in downtown Charlottesville, comprised of a new public plaza and 215,000 square feet of multi-use space, including a strategic combination of co-working, office space, shared amenities, and retail.
The structure’s forward-looking design begins with its exterior, where metal wall panels are arranged in a complex pattern that helps break up the mass of the 45,000-sq.-ft. structure and sets it apart from the typical high school gym.
The 26,000 square-foot Statue of Liberty Museum located on Liberty Island was designed to complement the experience of visitors to this important UNESCO heritage site by illustrating the sculpture’s historical significance and method of construction.
In an effort to avoid a stoppage in production, sub-purlins were installed on the damaged roof and attach a new metal roofing system to those sub-purlins.
Adding to the window energy efficiency was the use of trickle ventilators on the operating windows. Trickle ventilators, extensively used in Europe, provide a convenient alternative to opening windows for fresh air exchange without energy loss of the space conditioned interior air.
With 298 units and numerous amenities, Artisan is the first completed component of the Circle Square Master Plan, which is designed to develop a mixed-use, walkable community featuring retail, office, parking, and residential spaces.
Weather in Florida isn't what it used to be. Tropical storms and hurricane seasons have intensified in recent years. Buildings need to be able to withstand the worst, no matter their size.